United States North American Weekly Hotel Project Lead Report |
2020-04-03 |
|
Items that
appear in the report as "to be announced" or "unknown"
may appear with updated information in future reports |
Information
contained in this report may have changed since the date the market research
was conducted |
Information contained
in this report is intended for the subscriber. Distribution to third parties is prohibited |
Copyright © 2020 HotelProjectLeads.xcom |
|
Alaska Projects (2) |
Arkansas Projects (2) |
Arizona Projects (2) |
California Projects (2) |
Colorado Projects (2) |
Connecticut Projects (2) |
Washington DC Projects (2) |
Delaware Projects (2) |
Florida Projects (2) |
Georgia Projects (2) |
Hawaii Projects (2) |
Iowa Projects (2) |
Idaho Projects (2) |
Illinois Projects (2) |
Indiana Projects (2) |
Kansas Projects (2) |
Kentucky Projects (2) |
Louisiana Projects (2) |
Massachusetts Projects (2) |
Maryland Projects (2) |
Maine Projects (2) |
Michigan Projects (2) |
Minnesota Projects (2) |
Missouri Projects (2) |
Mississippi Projects (2) |
Montana Projects (2) |
North Carolina Projects (2) |
North Dakota Projects (2) |
Nebraska Projects (2) |
New Hampshire Projects (2) |
New Jersey Projects (2) |
New Mexico Projects (2) |
Nevada Projects (2) |
New York Projects (2) |
Ohio Projects (2) |
Oklahoma Projects (2) |
Oregon Projects (2) |
Pennsylvania Projects (2) |
Rhode Island Projects (2) |
South Carolina Projects (2) |
South Dakota Projects (2) |
Tennessee Projects (2) |
Texas Projects (2) |
Utah Projects (2) |
Virginia Projects (2) |
Vermont Projects (2) |
Washington Projects (2) |
Wisconsin Projects (2) |
West Virginia Projects (2) |
Wyoming Projects (2) |
Aruba Projects (2) |
Barbados Projects (2) |
Belize Projects (4) |
Canada Projects (20) |
Cayman Islands Projects (2) |
Cuba Projects (2) |
Dominican Republic Projects (2) |
Honduras Projects (2) |
Jamaica Projects (2) |
Mexico Projects (6) |
Nicaragua Projects (2) |
Panama Projects (2) |
Puerto Rico Projects (4) |
Saint Lucia Projects (2) |
Turks & Caicos Projects (2) |
HotelProjectLeads.com Preferred Vendor Directory |
"Design - Build - Supply - Operate - Maintain - Renovate" |
|
Project 1 |
Alaska Projects (2) |
Click to Return to Index |
Renovation |
Planning | Embassy Suites Hotel | Available to Subscribers | | AK | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
400 |
10000 sf |
$10,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 2 |
|
Click to Return to Index |
New construction |
Planning | Galleria Hotel | Available to Subscribers | | AK | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 3 |
Arkansas Projects (2) |
Click to Return to Index |
Renovation |
Planning | The Strand Hotel | Available to Subscribers | | AR | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
400 |
10000 sf |
$10,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 4 |
|
Click to Return to Index |
New construction |
Planning | Renaissance Club Sport Hotel | Available to Subscribers | | AR | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 5 |
Arizona Projects (2) |
Click to Return to Index |
Renovation |
Planning | Pacific City Hotel | Available to Subscribers | | AZ | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
400 |
10000 sf |
$10,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 6 |
|
Click to Return to Index |
New construction |
Planning | Starwood Hotel | Available to Subscribers | | AZ | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 7 |
California Projects (2) |
Click to Return to Index |
Renovation |
Planning | Manchester Resoort | Available to Subscribers | | CA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
400 |
10000 sf |
$10,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 8 |
|
Click to Return to Index |
New construction |
Planning | Best Western Miyako Inn | Available to Subscribers | | CA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 9 |
Colorado Projects (2) |
Click to Return to Index |
Renovation |
Planning | La Quinta Resort & Club | Available to Subscribers | | CO | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
400 |
10000 sf |
$10,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 10 |
|
Click to Return to Index |
New construction |
Planning | Berkeley Hotel | Available to Subscribers | | CO | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 11 |
Connecticut Projects (2) |
Click to Return to Index |
Renovation |
Planning | Limited Service Hotels | Available to Subscribers | | CT | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
400 |
10000 sf |
$10,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 12 |
|
Click to Return to Index |
New construction |
Planning | Mixed use Hotel | Available to Subscribers | | CT | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 13 |
Washington DC Projects (2) |
Click to Return to Index |
Renovation |
Planning | Hotel Name | Available to Subscribers | | DC | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
400 |
10000 sf |
$10,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 14 |
|
Click to Return to Index |
New construction |
Planning | Aspen Suites | Available to Subscribers | | DC | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 15 |
Delaware Projects (2) |
Click to Return to Index |
Renovation |
Planning | Mixed use development | Available to Subscribers | | DE | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
400 |
10000 sf |
$10,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 16 |
|
Click to Return to Index |
New construction |
Planning | Mixed use development | Available to Subscribers | | DE | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 17 |
Florida Projects (2) |
Click to Return to Index |
Renovation |
Planning | Greentree Resorts | Available to Subscribers | | FL | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
400 |
10000 sf |
$10,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 18 |
|
Click to Return to Index |
New construction |
Planning | Holiday Inn South Beach | Available to Subscribers | | FL | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 19 |
Georgia Projects (2) |
Click to Return to Index |
Renovation |
Planning | Savannah Suites | Available to Subscribers | | GA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
400 |
10000 sf |
$10,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 20 |
|
Click to Return to Index |
New construction |
Planning | Savannah Suites | Available to Subscribers | | GA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 21 |
Hawaii Projects (2) |
Click to Return to Index |
Renovation |
Planning | Savannah Suites | Available to Subscribers | | HI | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
400 |
10000 sf |
$10,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 22 |
|
Click to Return to Index |
New construction |
Planning | Savannah Suites | Available to Subscribers | | HI | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 23 |
Iowa Projects (2) |
Click to Return to Index |
Renovation |
Planning | Savannah Suites | Available to Subscribers | | IA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
10000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 24 |
|
Click to Return to Index |
New construction |
Planning | Savannah Suites | Available to Subscribers | | IA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 25 |
Idaho Projects (2) |
Click to Return to Index |
Renovation |
Planning | Waikiki Gateway Hotel | Available to Subscribers | | ID | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
10000 sf |
$10,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 26 |
|
Click to Return to Index |
New construction |
Planning | Hilton Garden Inn | Available to Subscribers | | ID | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 27 |
Illinois Projects (2) |
Click to Return to Index |
Renovation |
Planning | Jewish Federation Building | Available to Subscribers | | IL | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
10000 sf |
$10,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 28 |
|
Click to Return to Index |
New construction |
Planning | Marriott Snake River | Available to Subscribers | | IL | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 29 |
Indiana Projects (2) |
Click to Return to Index |
Renovation |
Planning | Hilton Garden Inn | Available to Subscribers | | IN | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
10000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 30 |
|
Click to Return to Index |
New construction |
Planning | MGM City Center | Available to Subscribers | | IN | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 31 |
Kansas Projects (2) |
Click to Return to Index |
Renovation |
Planning | The Legends Resort | Available to Subscribers | | KS | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 32 |
|
Click to Return to Index |
New construction |
Planning | Flushing Commons | Available to Subscribers | | KS | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 33 |
Kentucky Projects (2) |
Click to Return to Index |
Renovation |
Planning | Mount Washington Resort | Available to Subscribers | | KY | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 34 |
|
Click to Return to Index |
New construction |
Planning | Hampton Inn & Suites | Available to Subscribers | | KY | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 35 |
Louisiana Projects (2) |
Click to Return to Index |
Renovation |
Planning | Residence Inn | Available to Subscribers | | LA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 36 |
|
Click to Return to Index |
New construction |
Planning | Savannah Suites | Available to Subscribers | | LA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 37 |
Massachusetts Projects (2) |
Click to Return to Index |
Renovation |
Planning | Microtel Inn & Suites | Available to Subscribers | | MA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 38 |
|
Click to Return to Index |
New construction |
Planning | | Available to Subscribers | | MA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 39 |
Maryland Projects (2) |
Click to Return to Index |
Renovation |
Planning | Embassy Suites Hotel | Available to Subscribers | | MD | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 40 |
|
Click to Return to Index |
New construction |
Planning | Americ Inn | Available to Subscribers | | MD | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 41 |
Maine Projects (2) |
Click to Return to Index |
Renovation |
Planning | Hilton Garden Inn | Available to Subscribers | | ME | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 42 |
|
Click to Return to Index |
New construction |
Planning | Hotel Name | Available to Subscribers | | ME | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
7000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 43 |
Michigan Projects (2) |
Click to Return to Index |
Renovation |
Planning | Casino/Water Park | Available to Subscribers | | MI | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 44 |
|
Click to Return to Index |
New construction |
Planning | Hotel Del Coronado | Available to Subscribers | | MI | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 45 |
Minnesota Projects (2) |
Click to Return to Index |
Renovation |
Design | Courtyard by Marriott | Available to Subscribers | | MN | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 46 |
|
Click to Return to Index |
New construction |
Design | Rosewood Sandhill | Available to Subscribers | | MN | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 47 |
Missouri Projects (2) |
Click to Return to Index |
Renovation |
Design | Ritz Carlton Molasses Reef | Available to Subscribers | | MO | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 48 |
|
Click to Return to Index |
New construction |
Design | Viceroy Anguilla Resort & Spa | Available to Subscribers | | MO | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 49 |
Mississippi Projects (2) |
Click to Return to Index |
Renovation |
Design | Mountain Village Resort | Available to Subscribers | | MS | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 50 |
|
Click to Return to Index |
New construction |
Design | Rosewood Sandhill | Available to Subscribers | | MS | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 51 |
Montana Projects (2) |
Click to Return to Index |
Renovation |
Design | Mohegan Sun Casino | Available to Subscribers | | MT | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 52 |
|
Click to Return to Index |
New construction |
Design | Embassy Suites | Available to Subscribers | | MT | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 53 |
North Carolina Projects (2) |
Click to Return to Index |
Renovation |
Design | Four Seasons Resort | Available to Subscribers | | NC | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 54 |
|
Click to Return to Index |
New construction |
Design | Princeville Resort | Available to Subscribers | | NC | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 55 |
North Dakota Projects (2) |
Click to Return to Index |
Renovation |
Design | Hotel Pere Marquette | Available to Subscribers | | ND | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 56 |
|
Click to Return to Index |
New construction |
Design | The Statehouse Inn | Available to Subscribers | | ND | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 57 |
Nebraska Projects (2) |
Click to Return to Index |
Renovation |
Design | Townplace Suites | Available to Subscribers | | NE | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 58 |
|
Click to Return to Index |
New construction |
Design | Townplace Suites | Available to Subscribers | | NE | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 59 |
New Hampshire Projects (2) |
Click to Return to Index |
Renovation |
Design | Holiday Inn Select | Available to Subscribers | | NH | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 60 |
|
Click to Return to Index |
New construction |
Design | Sugarcane Bay Casino | Available to Subscribers | | NH | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 61 |
New Jersey Projects (2) |
Click to Return to Index |
Renovation |
Design | Berry Hill Plantation Resort | Available to Subscribers | | NJ | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 62 |
|
Click to Return to Index |
New construction |
Design | Casa Del Mar Beach Resort | Available to Subscribers | | NJ | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 63 |
New Mexico Projects (2) |
Click to Return to Index |
Renovation |
Design | Doubletree Hotel | Available to Subscribers | | NM | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 64 |
|
Click to Return to Index |
New construction |
Design | Renaissance Hotel | Available to Subscribers | | NM | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 65 |
Nevada Projects (2) |
Click to Return to Index |
Renovation |
Design | Hilton | Available to Subscribers | | NV | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 66 |
|
Click to Return to Index |
New construction |
Design | Best Western Pinon Plaza | Available to Subscribers | | NV | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 67 |
New York Projects (2) |
Click to Return to Index |
Renovation |
Design | Boutique Hotel | Available to Subscribers | | NY | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$1,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 68 |
|
Click to Return to Index |
New construction |
Design | Condo Hotel | Available to Subscribers | | NY | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$35,000,000 |
New construction of full service hotel |
Report Date |
Project 69 |
Ohio Projects (2) |
Click to Return to Index |
Renovation |
Design | Mixed use building | Available to Subscribers | | OH | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 70 |
|
Click to Return to Index |
New construction |
Design | Embassy Suites | Available to Subscribers | | OH | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 71 |
Oklahoma Projects (2) |
Click to Return to Index |
Renovation |
Design | Seven Springs Resort | Available to Subscribers | | OK | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 72 |
|
Click to Return to Index |
New construction |
Design | Hampton Inn & Suites | Available to Subscribers | | OK | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 73 |
Oregon Projects (2) |
Click to Return to Index |
Renovation |
Design | Hotel Name | Available to Subscribers | | OR | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 74 |
|
Click to Return to Index |
New construction |
Design | Marriott Marquis | Available to Subscribers | | OR | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 75 |
Pennsylvania Projects (2) |
Click to Return to Index |
Renovation |
Design | Lodge at Rancho Mirage | Available to Subscribers | | PA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 76 |
|
Click to Return to Index |
New construction |
Design | Holiday Inn Express | Available to Subscribers | | PA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 77 |
Rhode Island Projects (2) |
Click to Return to Index |
Renovation |
Design | Seville Beach Hotel | Available to Subscribers | | RI | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 78 |
|
Click to Return to Index |
New construction |
Design | Keauhou Beach Resort | Available to Subscribers | | RI | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 79 |
South Carolina Projects (2) |
Click to Return to Index |
Renovation |
Design | Holiday Inn Express | Available to Subscribers | | SC | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 80 |
|
Click to Return to Index |
New construction |
Design | | Available to Subscribers | | SC | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 81 |
South Dakota Projects (2) |
Click to Return to Index |
Renovation |
Design | Fairmont Hotel | Available to Subscribers | | SD | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 82 |
|
Click to Return to Index |
New construction |
Design | | Available to Subscribers | | SD | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 83 |
Tennessee Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Statle Towers | Available to Subscribers | | TN | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 84 |
|
Click to Return to Index |
New construction |
Pre-construction | Value Place | Available to Subscribers | | TN | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 85 |
Texas Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Value Place | Available to Subscribers | | TX | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 86 |
|
Click to Return to Index |
New construction |
Pre-construction | Value Place | Available to Subscribers | | TX | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 87 |
Utah Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Value Place | Available to Subscribers | | UT | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 88 |
|
Click to Return to Index |
New construction |
Pre-construction | Value Place | Available to Subscribers | | UT | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
14000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 89 |
Virginia Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Americas Best Value Inn | Available to Subscribers | | VA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 90 |
|
Click to Return to Index |
New construction |
Pre-construction | Westin Hotel | Available to Subscribers | | VA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
14000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 91 |
Vermont Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Greatwolf Resort | Available to Subscribers | | VT | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 92 |
|
Click to Return to Index |
New construction |
Pre-construction | Doral Tesoro Hotel | Available to Subscribers | | VT | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
14000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 93 |
Washington Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Value Place | Available to Subscribers | | WA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 94 |
|
Click to Return to Index |
New construction |
Pre-construction | Alexis Hotel | Available to Subscribers | | WA | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
14000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 95 |
Wisconsin Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Aspen Suites | Available to Subscribers | | WI | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 96 |
|
Click to Return to Index |
New construction |
Pre-construction | Aspen Suites | Available to Subscribers | | WI | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
14000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 97 |
West Virginia Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Redmont Hotel | Available to Subscribers | | WV | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 98 |
|
Click to Return to Index |
New construction |
Pre-construction | Hilton Garden Inn | Available to Subscribers | | WV | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
14000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 99 |
Wyoming Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | 5 Star Hotel | Available to Subscribers | | WY | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 100 |
|
Click to Return to Index |
New construction |
Pre-construction | Fox Plaza | Available to Subscribers | | WY | | USA | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
14000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 101 |
Aruba Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Pavillion Park | Available to Subscribers | | | | Aruba | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 102 |
|
Click to Return to Index |
New construction |
Pre-construction | Hotel Name | Available to Subscribers | | | | Aruba | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 103 |
Barbados Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Condo / Hotel | Available to Subscribers | | | | Barbados | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 104 |
|
Click to Return to Index |
New construction |
Pre-construction | Shangra-La Hotels | Available to Subscribers | | | | Barbados | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 105 |
Belize Projects (4) |
Click to Return to Index |
Renovation |
Pre-construction | Fells Points Landmark Hotel | Available to Subscribers | | | | Belize | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 106 |
|
Click to Return to Index |
New construction |
Pre-construction | | Available to Subscribers | | | | Belize | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
1st quarter 2021 |
100 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 107 |
|
Click to Return to Index |
New construction |
Pre-construction | Summit of Avendale | Available to Subscribers | | | | Belize | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 108 |
|
Click to Return to Index |
New construction |
Pre-construction | Mixed use development | Available to Subscribers | | | | Belize | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
1st quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 109 |
Canada Projects (20) |
Click to Return to Index |
Renovation |
Pre-construction | Microtel Inn & Suites | Available to Subscribers | | AB | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 110 |
|
Click to Return to Index |
New construction |
Pre-construction | Westin Hotel | Available to Subscribers | | AB | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
14000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 111 |
|
Click to Return to Index |
Renovation |
Pre-construction | Hampton Inn | Available to Subscribers | | BC | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 112 |
|
Click to Return to Index |
New construction |
Pre-construction | Montage Hotel & Public Gardens | Available to Subscribers | | BC | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
14000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 113 |
|
Click to Return to Index |
Renovation |
Pre-construction | Mixed use development | Available to Subscribers | | MB | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 114 |
|
Click to Return to Index |
New construction |
Pre-construction | Limited Service Hotel | Available to Subscribers | | MB | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
14000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 115 |
|
Click to Return to Index |
Renovation |
Pre-construction | Naples Bay Resort | Available to Subscribers | | NB | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 116 |
|
Click to Return to Index |
New construction |
Pre-construction | Hilton Hawaiian Village | Available to Subscribers | | NB | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
14000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 117 |
|
Click to Return to Index |
Renovation |
Pre-construction | Rosewood Sandhill | Available to Subscribers | | NL | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 118 |
|
Click to Return to Index |
New construction |
Pre-construction | Book Cadillac Hotel | Available to Subscribers | | NL | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
14000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 119 |
|
Click to Return to Index |
Renovation |
Pre-construction | Sheraton | Available to Subscribers | | NS | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 120 |
|
Click to Return to Index |
New construction |
Pre-construction | Condo Hotel | Available to Subscribers | | NS | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
14000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 121 |
|
Click to Return to Index |
Renovation |
Pre-construction | Ritz Carlton Phase II | Available to Subscribers | | ON | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 122 |
|
Click to Return to Index |
New construction |
Pre-construction | Grand Cambrian Resort | Available to Subscribers | | ON | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
14000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 123 |
|
Click to Return to Index |
Renovation |
Pre-construction | Ritz Carlton | Available to Subscribers | | PE | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 124 |
|
Click to Return to Index |
New construction |
Pre-construction | Clarion Hotel | Available to Subscribers | | PE | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
14000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 125 |
|
Click to Return to Index |
Renovation |
Pre-construction | Full Service Hotel | Available to Subscribers | | QC | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
5000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 126 |
|
Click to Return to Index |
New construction |
Pre-construction | The Saxony Hotel | Available to Subscribers | | QC | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
14000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 127 |
|
Click to Return to Index |
Renovation |
Pre-construction | Sun Island Resort | Available to Subscribers | | SK | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$2,500,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 128 |
|
Click to Return to Index |
New construction |
Pre-construction | Value Place | Available to Subscribers | | SK | | Canada | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
14000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 129 |
Cayman Islands Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Holiday Inn Willowbrook | Available to Subscribers | | | | Cayman Islands | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 130 |
|
Click to Return to Index |
New construction |
Pre-construction | | Available to Subscribers | | | | Cayman Islands | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 131 |
Cuba Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | The Lodge at Rancho Marage | Available to Subscribers | | | | Cuba | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 132 |
|
Click to Return to Index |
New construction |
Pre-construction | Casino Resort | Available to Subscribers | | | | Cuba | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 133 |
Dominican Republic Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | W Hotel | Available to Subscribers | | | | Dominican Republic | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 134 |
|
Click to Return to Index |
New construction |
Pre-construction | Knickerbocker Hotel | Available to Subscribers | | | | Dominican Republic | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 135 |
Honduras Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | C.A Beach Resort | Available to Subscribers | | | | Honduras | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 136 |
|
Click to Return to Index |
New construction |
Pre-construction | Crown Plaza Hotel | Available to Subscribers | | | | Honduras | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 137 |
Jamaica Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Wyndham Miami Airport | Available to Subscribers | | | | Jamaica | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 138 |
|
Click to Return to Index |
New construction |
Pre-construction | Hilton | Available to Subscribers | | | | Jamaica | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 139 |
Mexico Projects (6) |
Click to Return to Index |
Renovation |
Pre-construction | Mountain Village Hotel | Available to Subscribers | Mexico City | DF | | Mexico | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 140 |
|
Click to Return to Index |
New construction |
Pre-construction | Best Western Pelican Beach Resort | Available to Subscribers | Mexico City | DF | | Mexico | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
14000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 141 |
|
Click to Return to Index |
Renovation |
Pre-construction | Hilton | Available to Subscribers | Cancun | | | Mexico | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 142 |
|
Click to Return to Index |
Renovation |
Pre-construction | Ramada | Available to Subscribers | | | | Mexico | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
200 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 143 |
|
Click to Return to Index |
New construction |
Pre-construction | Westin Crown Center | Available to Subscribers | Cancun | | | Mexico | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 144 |
|
Click to Return to Index |
New construction |
Pre-construction | | Available to Subscribers | | | | Mexico | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 145 |
Nicaragua Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Sheraton | Available to Subscribers | | | | Nicaragua | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 146 |
|
Click to Return to Index |
New construction |
Pre-construction | Hampton Inn | Available to Subscribers | | | | Nicaragua | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 147 |
Panama Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Embassy Suites | Available to Subscribers | | | | Panama | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 148 |
|
Click to Return to Index |
New construction |
Pre-construction | The Martinique | Available to Subscribers | | | | Panama | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 149 |
Puerto Rico Projects (4) |
Click to Return to Index |
Renovation |
Design | Claremont Resort & Spa | Available to Subscribers | | | | Puerto Rico | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 150 |
|
Click to Return to Index |
Renovation |
Design | JW Marriott | Available to Subscribers | | | | Puerto Rico | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
5000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 151 |
|
Click to Return to Index |
New construction |
Design | | Available to Subscribers | | | | Puerto Rico | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 152 |
|
Click to Return to Index |
New construction |
Design | Hyatt Regency Crown Center | Available to Subscribers | | | | Puerto Rico | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
300 |
6000 sf |
$50,000,000 |
New construction of full service hotel |
Report Date |
Project 153 |
Saint Lucia Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Caesars Indiana Bridgeport | Available to Subscribers | | | | Saint Lucia | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 154 |
|
Click to Return to Index |
New construction |
Pre-construction | | Available to Subscribers | | | | Saint Lucia | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
Project 155 |
Turks & Caicos Projects (2) |
Click to Return to Index |
Renovation |
Pre-construction | Wyndham Bonnett Creek | Available to Subscribers | | | | Turks & Caicos | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
100 |
6000 sf |
$5,000,000 |
Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
Report Date |
Project 156 |
|
Click to Return to Index |
New construction |
Pre-construction | Limited Service Hotel | Available to Subscribers | | | | Turks & Caicos | | | | | | | |
Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
4th quarter 2020 |
4th quarter 2020 |
2nd quarter 2021 |
150 |
6000 sf |
$30,000,000 |
New construction of full service hotel |
Report Date |
End of Report |