| www.HotelProjectLeads.com |
| The
Hotel Vendors Resource and Your Full Time Market Research Partner |
| United States North American Weekly Hotel Project Lead Report |
| 2020-04-03 |
| |
| Items that
appear in the report as "to be announced" or "unknown"
may appear with updated information in future reports |
| Information
contained in this report may have changed since the date the market research
was conducted |
| Information contained
in this report is intended for the subscriber. Distribution to third parties is prohibited |
| Copyright © 2020 HotelProjectLeads.xcom |
| |
| Alaska Projects (2) |
| Arkansas Projects (2) |
| Arizona Projects (2) |
| California Projects (2) |
| Colorado Projects (2) |
| Connecticut Projects (2) |
| Washington DC Projects (2) |
| Delaware Projects (2) |
| Florida Projects (2) |
| Georgia Projects (2) |
| Hawaii Projects (2) |
| Iowa Projects (2) |
| Idaho Projects (2) |
| Illinois Projects (2) |
| Indiana Projects (2) |
| Kansas Projects (2) |
| Kentucky Projects (2) |
| Louisiana Projects (2) |
| Massachusetts Projects (2) |
| Maryland Projects (2) |
| Maine Projects (2) |
| Michigan Projects (2) |
| Minnesota Projects (2) |
| Missouri Projects (2) |
| Mississippi Projects (2) |
| Montana Projects (2) |
| North Carolina Projects (2) |
| North Dakota Projects (2) |
| Nebraska Projects (2) |
| New Hampshire Projects (2) |
| New Jersey Projects (2) |
| New Mexico Projects (2) |
| Nevada Projects (2) |
| New York Projects (2) |
| Ohio Projects (2) |
| Oklahoma Projects (2) |
| Oregon Projects (2) |
| Pennsylvania Projects (2) |
| Rhode Island Projects (2) |
| South Carolina Projects (2) |
| South Dakota Projects (2) |
| Tennessee Projects (2) |
| Texas Projects (2) |
| Utah Projects (2) |
| Virginia Projects (2) |
| Vermont Projects (2) |
| Washington Projects (2) |
| Wisconsin Projects (2) |
| West Virginia Projects (2) |
| Wyoming Projects (2) |
| Aruba Projects (2) |
| Barbados Projects (2) |
| Belize Projects (4) |
| Canada Projects (20) |
| Cayman Islands Projects (2) |
| Cuba Projects (2) |
| Dominican Republic Projects (2) |
| Honduras Projects (2) |
| Jamaica Projects (2) |
| Mexico Projects (6) |
| Nicaragua Projects (2) |
| Panama Projects (2) |
| Puerto Rico Projects (4) |
| Saint Lucia Projects (2) |
| Turks & Caicos Projects (2) |
| HotelProjectLeads.com Preferred Vendor Directory |
| "Design - Build - Supply - Operate - Maintain - Renovate" |
| |
| Project 1 |
| Alaska Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Embassy Suites Hotel | Available to Subscribers | | AK | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 400 |
| 10000 sf |
| $10,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 2 |
|
| Click to Return to Index |
| New construction |
| Planning | Galleria Hotel | Available to Subscribers | | AK | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 3 |
| Arkansas Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | The Strand Hotel | Available to Subscribers | | AR | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 400 |
| 10000 sf |
| $10,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 4 |
|
| Click to Return to Index |
| New construction |
| Planning | Renaissance Club Sport Hotel | Available to Subscribers | | AR | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 5 |
| Arizona Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Pacific City Hotel | Available to Subscribers | | AZ | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 400 |
| 10000 sf |
| $10,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 6 |
|
| Click to Return to Index |
| New construction |
| Planning | Starwood Hotel | Available to Subscribers | | AZ | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 7 |
| California Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Manchester Resoort | Available to Subscribers | | CA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 400 |
| 10000 sf |
| $10,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 8 |
|
| Click to Return to Index |
| New construction |
| Planning | Best Western Miyako Inn | Available to Subscribers | | CA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 9 |
| Colorado Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | La Quinta Resort & Club | Available to Subscribers | | CO | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 400 |
| 10000 sf |
| $10,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 10 |
|
| Click to Return to Index |
| New construction |
| Planning | Berkeley Hotel | Available to Subscribers | | CO | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 11 |
| Connecticut Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Limited Service Hotels | Available to Subscribers | | CT | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 400 |
| 10000 sf |
| $10,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 12 |
|
| Click to Return to Index |
| New construction |
| Planning | Mixed use Hotel | Available to Subscribers | | CT | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 13 |
| Washington DC Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Hotel Name | Available to Subscribers | | DC | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 400 |
| 10000 sf |
| $10,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 14 |
|
| Click to Return to Index |
| New construction |
| Planning | Aspen Suites | Available to Subscribers | | DC | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 15 |
| Delaware Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Mixed use development | Available to Subscribers | | DE | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 400 |
| 10000 sf |
| $10,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 16 |
|
| Click to Return to Index |
| New construction |
| Planning | Mixed use development | Available to Subscribers | | DE | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 17 |
| Florida Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Greentree Resorts | Available to Subscribers | | FL | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 400 |
| 10000 sf |
| $10,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 18 |
|
| Click to Return to Index |
| New construction |
| Planning | Holiday Inn South Beach | Available to Subscribers | | FL | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 19 |
| Georgia Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Savannah Suites | Available to Subscribers | | GA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 400 |
| 10000 sf |
| $10,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 20 |
|
| Click to Return to Index |
| New construction |
| Planning | Savannah Suites | Available to Subscribers | | GA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 21 |
| Hawaii Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Savannah Suites | Available to Subscribers | | HI | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 400 |
| 10000 sf |
| $10,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 22 |
|
| Click to Return to Index |
| New construction |
| Planning | Savannah Suites | Available to Subscribers | | HI | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 23 |
| Iowa Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Savannah Suites | Available to Subscribers | | IA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 10000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 24 |
|
| Click to Return to Index |
| New construction |
| Planning | Savannah Suites | Available to Subscribers | | IA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 25 |
| Idaho Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Waikiki Gateway Hotel | Available to Subscribers | | ID | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 10000 sf |
| $10,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 26 |
|
| Click to Return to Index |
| New construction |
| Planning | Hilton Garden Inn | Available to Subscribers | | ID | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 27 |
| Illinois Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Jewish Federation Building | Available to Subscribers | | IL | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 10000 sf |
| $10,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 28 |
|
| Click to Return to Index |
| New construction |
| Planning | Marriott Snake River | Available to Subscribers | | IL | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 29 |
| Indiana Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Hilton Garden Inn | Available to Subscribers | | IN | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 10000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 30 |
|
| Click to Return to Index |
| New construction |
| Planning | MGM City Center | Available to Subscribers | | IN | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 31 |
| Kansas Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | The Legends Resort | Available to Subscribers | | KS | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 32 |
|
| Click to Return to Index |
| New construction |
| Planning | Flushing Commons | Available to Subscribers | | KS | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 33 |
| Kentucky Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Mount Washington Resort | Available to Subscribers | | KY | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 34 |
|
| Click to Return to Index |
| New construction |
| Planning | Hampton Inn & Suites | Available to Subscribers | | KY | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 35 |
| Louisiana Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Residence Inn | Available to Subscribers | | LA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 36 |
|
| Click to Return to Index |
| New construction |
| Planning | Savannah Suites | Available to Subscribers | | LA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 37 |
| Massachusetts Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Microtel Inn & Suites | Available to Subscribers | | MA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 38 |
|
| Click to Return to Index |
| New construction |
| Planning | | Available to Subscribers | | MA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 39 |
| Maryland Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Embassy Suites Hotel | Available to Subscribers | | MD | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 40 |
|
| Click to Return to Index |
| New construction |
| Planning | Americ Inn | Available to Subscribers | | MD | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 41 |
| Maine Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Hilton Garden Inn | Available to Subscribers | | ME | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 42 |
|
| Click to Return to Index |
| New construction |
| Planning | Hotel Name | Available to Subscribers | | ME | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 7000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 43 |
| Michigan Projects (2) |
| Click to Return to Index |
| Renovation |
| Planning | Casino/Water Park | Available to Subscribers | | MI | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 44 |
|
| Click to Return to Index |
| New construction |
| Planning | Hotel Del Coronado | Available to Subscribers | | MI | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 45 |
| Minnesota Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Courtyard by Marriott | Available to Subscribers | | MN | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 46 |
|
| Click to Return to Index |
| New construction |
| Design | Rosewood Sandhill | Available to Subscribers | | MN | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 47 |
| Missouri Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Ritz Carlton Molasses Reef | Available to Subscribers | | MO | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 48 |
|
| Click to Return to Index |
| New construction |
| Design | Viceroy Anguilla Resort & Spa | Available to Subscribers | | MO | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 49 |
| Mississippi Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Mountain Village Resort | Available to Subscribers | | MS | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 50 |
|
| Click to Return to Index |
| New construction |
| Design | Rosewood Sandhill | Available to Subscribers | | MS | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 51 |
| Montana Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Mohegan Sun Casino | Available to Subscribers | | MT | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 52 |
|
| Click to Return to Index |
| New construction |
| Design | Embassy Suites | Available to Subscribers | | MT | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 53 |
| North Carolina Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Four Seasons Resort | Available to Subscribers | | NC | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 54 |
|
| Click to Return to Index |
| New construction |
| Design | Princeville Resort | Available to Subscribers | | NC | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 55 |
| North Dakota Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Hotel Pere Marquette | Available to Subscribers | | ND | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 56 |
|
| Click to Return to Index |
| New construction |
| Design | The Statehouse Inn | Available to Subscribers | | ND | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 57 |
| Nebraska Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Townplace Suites | Available to Subscribers | | NE | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 58 |
|
| Click to Return to Index |
| New construction |
| Design | Townplace Suites | Available to Subscribers | | NE | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 59 |
| New Hampshire Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Holiday Inn Select | Available to Subscribers | | NH | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 60 |
|
| Click to Return to Index |
| New construction |
| Design | Sugarcane Bay Casino | Available to Subscribers | | NH | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 61 |
| New Jersey Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Berry Hill Plantation Resort | Available to Subscribers | | NJ | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 62 |
|
| Click to Return to Index |
| New construction |
| Design | Casa Del Mar Beach Resort | Available to Subscribers | | NJ | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 63 |
| New Mexico Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Doubletree Hotel | Available to Subscribers | | NM | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 64 |
|
| Click to Return to Index |
| New construction |
| Design | Renaissance Hotel | Available to Subscribers | | NM | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 65 |
| Nevada Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Hilton | Available to Subscribers | | NV | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 66 |
|
| Click to Return to Index |
| New construction |
| Design | Best Western Pinon Plaza | Available to Subscribers | | NV | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 67 |
| New York Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Boutique Hotel | Available to Subscribers | | NY | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $1,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 68 |
|
| Click to Return to Index |
| New construction |
| Design | Condo Hotel | Available to Subscribers | | NY | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $35,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 69 |
| Ohio Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Mixed use building | Available to Subscribers | | OH | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 70 |
|
| Click to Return to Index |
| New construction |
| Design | Embassy Suites | Available to Subscribers | | OH | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 71 |
| Oklahoma Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Seven Springs Resort | Available to Subscribers | | OK | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 72 |
|
| Click to Return to Index |
| New construction |
| Design | Hampton Inn & Suites | Available to Subscribers | | OK | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 73 |
| Oregon Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Hotel Name | Available to Subscribers | | OR | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 74 |
|
| Click to Return to Index |
| New construction |
| Design | Marriott Marquis | Available to Subscribers | | OR | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 75 |
| Pennsylvania Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Lodge at Rancho Mirage | Available to Subscribers | | PA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 76 |
|
| Click to Return to Index |
| New construction |
| Design | Holiday Inn Express | Available to Subscribers | | PA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 77 |
| Rhode Island Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Seville Beach Hotel | Available to Subscribers | | RI | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 78 |
|
| Click to Return to Index |
| New construction |
| Design | Keauhou Beach Resort | Available to Subscribers | | RI | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 79 |
| South Carolina Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Holiday Inn Express | Available to Subscribers | | SC | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 80 |
|
| Click to Return to Index |
| New construction |
| Design | | Available to Subscribers | | SC | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 81 |
| South Dakota Projects (2) |
| Click to Return to Index |
| Renovation |
| Design | Fairmont Hotel | Available to Subscribers | | SD | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 82 |
|
| Click to Return to Index |
| New construction |
| Design | | Available to Subscribers | | SD | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 83 |
| Tennessee Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Statle Towers | Available to Subscribers | | TN | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 84 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Value Place | Available to Subscribers | | TN | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 85 |
| Texas Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Value Place | Available to Subscribers | | TX | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 86 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Value Place | Available to Subscribers | | TX | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 87 |
| Utah Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Value Place | Available to Subscribers | | UT | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 88 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Value Place | Available to Subscribers | | UT | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 14000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 89 |
| Virginia Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Americas Best Value Inn | Available to Subscribers | | VA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 90 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Westin Hotel | Available to Subscribers | | VA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 14000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 91 |
| Vermont Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Greatwolf Resort | Available to Subscribers | | VT | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 92 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Doral Tesoro Hotel | Available to Subscribers | | VT | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 14000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 93 |
| Washington Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Value Place | Available to Subscribers | | WA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 94 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Alexis Hotel | Available to Subscribers | | WA | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 14000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 95 |
| Wisconsin Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Aspen Suites | Available to Subscribers | | WI | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 96 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Aspen Suites | Available to Subscribers | | WI | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 14000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 97 |
| West Virginia Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Redmont Hotel | Available to Subscribers | | WV | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 98 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Hilton Garden Inn | Available to Subscribers | | WV | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 14000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 99 |
| Wyoming Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | 5 Star Hotel | Available to Subscribers | | WY | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 100 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Fox Plaza | Available to Subscribers | | WY | | USA | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 14000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 101 |
| Aruba Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Pavillion Park | Available to Subscribers | | | | Aruba | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 102 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Hotel Name | Available to Subscribers | | | | Aruba | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 103 |
| Barbados Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Condo / Hotel | Available to Subscribers | | | | Barbados | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 104 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Shangra-La Hotels | Available to Subscribers | | | | Barbados | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 105 |
| Belize Projects (4) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Fells Points Landmark Hotel | Available to Subscribers | | | | Belize | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 106 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | | Available to Subscribers | | | | Belize | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 1st quarter 2021 |
| 100 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 107 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Summit of Avendale | Available to Subscribers | | | | Belize | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 108 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Mixed use development | Available to Subscribers | | | | Belize | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 1st quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 109 |
| Canada Projects (20) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Microtel Inn & Suites | Available to Subscribers | | AB | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 110 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Westin Hotel | Available to Subscribers | | AB | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 14000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 111 |
|
| Click to Return to Index |
| Renovation |
| Pre-construction | Hampton Inn | Available to Subscribers | | BC | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 112 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Montage Hotel & Public Gardens | Available to Subscribers | | BC | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 14000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 113 |
|
| Click to Return to Index |
| Renovation |
| Pre-construction | Mixed use development | Available to Subscribers | | MB | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 114 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Limited Service Hotel | Available to Subscribers | | MB | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 14000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 115 |
|
| Click to Return to Index |
| Renovation |
| Pre-construction | Naples Bay Resort | Available to Subscribers | | NB | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 116 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Hilton Hawaiian Village | Available to Subscribers | | NB | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 14000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 117 |
|
| Click to Return to Index |
| Renovation |
| Pre-construction | Rosewood Sandhill | Available to Subscribers | | NL | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 118 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Book Cadillac Hotel | Available to Subscribers | | NL | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 14000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 119 |
|
| Click to Return to Index |
| Renovation |
| Pre-construction | Sheraton | Available to Subscribers | | NS | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 120 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Condo Hotel | Available to Subscribers | | NS | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 14000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 121 |
|
| Click to Return to Index |
| Renovation |
| Pre-construction | Ritz Carlton Phase II | Available to Subscribers | | ON | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 122 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Grand Cambrian Resort | Available to Subscribers | | ON | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 14000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 123 |
|
| Click to Return to Index |
| Renovation |
| Pre-construction | Ritz Carlton | Available to Subscribers | | PE | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 124 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Clarion Hotel | Available to Subscribers | | PE | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 14000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 125 |
|
| Click to Return to Index |
| Renovation |
| Pre-construction | Full Service Hotel | Available to Subscribers | | QC | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 5000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 126 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | The Saxony Hotel | Available to Subscribers | | QC | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 14000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 127 |
|
| Click to Return to Index |
| Renovation |
| Pre-construction | Sun Island Resort | Available to Subscribers | | SK | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $2,500,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 128 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Value Place | Available to Subscribers | | SK | | Canada | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 14000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 129 |
| Cayman Islands Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Holiday Inn Willowbrook | Available to Subscribers | | | | Cayman Islands | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 130 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | | Available to Subscribers | | | | Cayman Islands | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 131 |
| Cuba Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | The Lodge at Rancho Marage | Available to Subscribers | | | | Cuba | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 132 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Casino Resort | Available to Subscribers | | | | Cuba | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 133 |
| Dominican Republic Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | W Hotel | Available to Subscribers | | | | Dominican Republic | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 134 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Knickerbocker Hotel | Available to Subscribers | | | | Dominican Republic | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 135 |
| Honduras Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | C.A Beach Resort | Available to Subscribers | | | | Honduras | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 136 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Crown Plaza Hotel | Available to Subscribers | | | | Honduras | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 137 |
| Jamaica Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Wyndham Miami Airport | Available to Subscribers | | | | Jamaica | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 138 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Hilton | Available to Subscribers | | | | Jamaica | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 139 |
| Mexico Projects (6) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Mountain Village Hotel | Available to Subscribers | Mexico City | DF | | Mexico | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 140 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Best Western Pelican Beach Resort | Available to Subscribers | Mexico City | DF | | Mexico | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 14000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 141 |
|
| Click to Return to Index |
| Renovation |
| Pre-construction | Hilton | Available to Subscribers | Cancun | | | Mexico | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 142 |
|
| Click to Return to Index |
| Renovation |
| Pre-construction | Ramada | Available to Subscribers | | | | Mexico | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 200 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 143 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Westin Crown Center | Available to Subscribers | Cancun | | | Mexico | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 144 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | | Available to Subscribers | | | | Mexico | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 145 |
| Nicaragua Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Sheraton | Available to Subscribers | | | | Nicaragua | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 146 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Hampton Inn | Available to Subscribers | | | | Nicaragua | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 147 |
| Panama Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Embassy Suites | Available to Subscribers | | | | Panama | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 148 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | The Martinique | Available to Subscribers | | | | Panama | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 149 |
| Puerto Rico Projects (4) |
| Click to Return to Index |
| Renovation |
| Design | Claremont Resort & Spa | Available to Subscribers | | | | Puerto Rico | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 150 |
|
| Click to Return to Index |
| Renovation |
| Design | JW Marriott | Available to Subscribers | | | | Puerto Rico | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 5000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 151 |
|
| Click to Return to Index |
| New construction |
| Design | | Available to Subscribers | | | | Puerto Rico | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 152 |
|
| Click to Return to Index |
| New construction |
| Design | Hyatt Regency Crown Center | Available to Subscribers | | | | Puerto Rico | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 300 |
| 6000 sf |
| $50,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 153 |
| Saint Lucia Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Caesars Indiana Bridgeport | Available to Subscribers | | | | Saint Lucia | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 154 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | | Available to Subscribers | | | | Saint Lucia | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| Project 155 |
| Turks & Caicos Projects (2) |
| Click to Return to Index |
| Renovation |
| Pre-construction | Wyndham Bonnett Creek | Available to Subscribers | | | | Turks & Caicos | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 100 |
| 6000 sf |
| $5,000,000 |
| Guestrooms, restaurant, pool, lobby, meeting rooms, public space and exterior renovation |
| Report Date |
| Project 156 |
|
| Click to Return to Index |
| New construction |
| Pre-construction | Limited Service Hotel | Available to Subscribers | | | | Turks & Caicos | | | | | | | |
| Owner/Developer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Manager | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Designer | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| Architect | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| GC / CM | Available to Subscribers | Available to Subscribers | | | | | | | | | | | |
| 4th quarter 2020 |
| 4th quarter 2020 |
| 2nd quarter 2021 |
| 150 |
| 6000 sf |
| $30,000,000 |
| New construction of full service hotel |
| Report Date |
| End of Report |