Hotel development and management company Drury Development Corporation renewed their development for a nine-story hotel in Arlington Texas. Construction will resume next month at their stalled project at the corner of Interstate 30 and Center Street. Drury anticipates finishing construction and open its doors in early 2024. The Drury location sits across the street from Lincoln Square, a shopping center that was the subject of a $15 million grant for redevelopment in late June. Arlington City Council approved Drury’s development plan for a hotel, restaurant and future office or storefront on the property in 2017. Hotel representatives around 2020 outlined plans for a 268-room hotel that features top-floor meeting rooms that offer a view of AT&T Stadium and Globe Life Field, as well as an indoor and outdoor pool with an adjustable glass wall.
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


A hotel project in downtown San Jose California is moving forward. The proposed 19-story high-rise hotel with 272 rooms could be built right next door to Hotel De Anza at 8 North Almaden Boulevard near the intersection of West Santa Clara Street. After the San Jose City Council approved the project two years, the Preservationist Action Council of San Jose (PAC SJ) had been trying to block plans for the hotel from moving forward. Their attempts have been shut down first by Santa Clara County judges and most recently, by the state Court of Appeal, which sided with an earlier ruling by county courts that favored the city’s approval of the project allowing the project to proceed. The project is being designed by C2K Architecture. Mark Tersini, principal at KT Urban is the project developer.  
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


The Stations Casino & Hotel project in North Las Vegas, Nevada, is moving forward at the North Las Vegas Planning Commission approved Station’s plans for a 67-acre hotel-casino at the northwest corner of Losee Road and the 215 Beltway. The project would be built in two phases and calls for a total of 600 hotel rooms and more than 75,700 square feet of casino space. It would also feature restaurants, a movie theater, banquet facilities and other amenities. Stations is also building a $750 million resort in the southwest Las Vegas Valley and is developing plans for other land tracts, with the goal of doubling its portfolio by 2030. It is also tearing down some hotels in North Las Vegas that never reopened after the pandemic, and intends to sell the land. Additionally, it plans to demolish the Wild Wild West hotel-casino near the Strip and redevelop the site. Jeffrey Welch is chief legal officer of Station parent Red Rock Resorts.  
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


A proposal to add a 14-story, 290-room hotel and new retail space next to Little Caesars Arena in downtown Detroit Michigan is moving forward. The Downtown Detroit Development Authority approved a $190 million development proposal from Olympia Development and Related Cos. The proposal is for a mid-rise, mixed-use hotel development at Woodward Avenue and the I-75 service drive, next to LCA, a plan the companies previously had announced. The project site is at 2455 Woodward Ave. and is bordered by Woodward to the East, LCA to the north, Park Avenue to the west and W. Fisher Service Drive to the south. The proposal calls for a hotel, as well as up to 30,000 square feet dedicated to street-level retail and food service. Construction would take 3 years and begin in the 3rd quarter of 2024. Andrew Cantor is the president of Related Cos. Michigan.  
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


A new hotel is in the planning stages and would be built just south of Allegiant Stadium in Las Vegas Nevada. The hotel is being proposed by New Angle Development calling the project, Nuance Las Vegas Hotel & Spa at Allegiant Stadium. It would be built at the corner of Polaris and Quail avenues and includes a full-service hotel and spa that would serve as a destination property for people looking to be close to the stadium and would be a non-gaming, non-smoking, full-service, boutique-sized property providing an alternative experience to the typical massive Las Vegas hotel-casino offerings. The hotel would be 19 stories tall and have 340 rooms, along with a restaurant, day spa, and ballroom and convention hall. The 19th floor would also have a rooftop bar with kitchen and outdoor terrace. A parking garage would occupy four of the bottom floors with 521 spaces.  
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


Two of the oldest buildings on the University of Maine campus in Orono Maine will undergo a $17 million transformation to become a 95-room boutique hotel. The project is the result of a partnership between the university; Harrison Street Investment Management and Radnor Property Group. The project will include the conversion of Coburn Hall and Holmes Hall.  Built in 1888, Coburn Hall and Holmes Hall, which have been non-operational for the past 15 years, will be converted into a boutique, on-campus hotel with 95 hotel rooms and suites and a bistro cafe. Both halls display the Romanesque architectural style of the time, and in 1978 were among 10 UMaine buildings designated a historic district by the National Register of Historic Places. The buildings together offer 33,000 square feet of space. The property will be operated by Olympia Hotel Management. Archetype Architects is designing the project and Wright-Ryan Construction will serve as construction manager. The project is scheduled to begin construction this fall, with a planned opening in early 2024. 
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


Contractor Moss Construction applied for a permit to begin foundation work at the 80-Story Cipriani & Residences condo/hotel tower, in Miami’s Florida’s Brickell area downtown.  There’s also now another foundation permit in process at the property, for the area where two additional apartment towers are planned to rise 50 and 60 stories.  The second foundation permit for the shorter towers was also submitted by Moss.  The project will include three towers rising 80, 60, and 50 stories, with the tallest at 950 feet including 1,300 residential units with 420 condos & 18,300 square feet of full service restaurant.  Mast Capital is the project developer.  Arquitectonica is the project architect.  1508 London is the interior designer. 

For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


The owner of the Doubletree Hotel on Park Avenue in Park City Utah plans to redevelop the site and build over 250 long-term rental apartments and condos. The 182-room hotel anchors the gateway intersection of SR-224 and Kearns Boulevard. It’s owned by Singerman Real Estate. Vail Resorts previously operated the hotel under a management agreement with Singerman. The two proposed buildings in the project would fall under separate development rules. The east building would be 147 deed-restricted affordable units and 26 market-rate units. It would fall under the affordable master planned development code. The west building would feature 100 market-rate condos and be governed by the master planned development code. Unlike the affordable master plan, this building would allow for nightly rentals. The project would involve razing the existing building and starting from the ground up. It would include 5,000 square feet of ground floor retail space. Over 300 parking spaces would be built underground, along with 17 curbside spots.
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


Developer Two Roads is planning to tear down an existing condo building in the Edgewater neighborhood of Miami Florida to build a 55-story condo hotel. The Marriott Edition Residences will contain 155 units and is being designed by Arquitectonica, with interiors by Studio Munge. Prices start at $1.7 million for the condos, which will range from 1,952 to 3,864 square feet. The 3.5 acre site is located at 2121 N Bayshore Drive. Two Roads Development plans to break ground on Edition Residences, Miami Edgewater in summer 2023. Construction is expected to take three years. The building would have more than 45,000 square feet of amenities, including two pools, a fitness center, yoga and spinning rooms, a spa, a club lounge, a library, a movie room, a dog spa, and a kid’s play area. The condo would also have six guest suites that residents can book for their visitors. Douglas Elliman is the broker for the condo sales. Taylor Collins, is managing partner of Two Roads.  
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


The Turlock California Planning Commission officially approved that the building of a new Marriott TownePlace hotel be exempt from the Westside Industrial Specific Plan’s 35-foot height limit allowing the project to move forward. The proposed four-story Marriott TownePlace hotel at 201 N. Tully Rd. will stand at 61 feet and 6 inches from grade to highest point. With these measurements, it will be the highest hotel in Turlock by 1 foot and 6 inches. The project is being developed by BM5 Hospitality LLC. The Marriott TownePlace project includes a 4-story, 91-room hotel on a 2-acre parcel located at N. Tully Rd. The lot is next to the Comfort Suites and Days Inn on N. Tully Road. A total of 88 onsite parking spaces will be built. Additional improvements include paving, parking lot striping, lighting, fenced outdoor pool area and landscaping. A minimum 15-foot-wide landscape bed will be required to be planted along North Tully Road. A 10-foot-wide landscape area will be required along the west property line abutting the Highway 99 frontage as well as parking lot shade trees and landscape islands planted throughout the project site. All new landscaping must comply with the Model Water Efficient Landscape Ordinance. The project would also include curb, gutter and sidewalk improvements adjacent to the hotel.
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.

1 45 46 47 48 49 120