Plans for a hotel key to the Pinehurst Resort’s in Pinehurst North Carolina new role as an anchor site for the U.S. Open and other golfing championships have cleared the first phase of the village’s approval process. The 64,000 sf resort is planned off of Carolina Vista Drive. The project with the working title The Lodge at Pinehurst will contain 34 rooms, including some suites, lobby, meeting spaces, locker room, fitness area and bar. It’s scheduled to be finished by the end of 2023, in time for the next U.S. Open at Pinehurst No. 2 in 2024. The hotel is being designed by Cooper Carry Architects. Tom Pashley is president of the Pinehurst Resort.
 
For more information on this and upcoming hotel construction and renovation projects in the planning, design, pre-construction and construction phase including who is involved with their contact information, Project & Supply Pricing QuotesPreferred Vendor DirectoryCareers & Featured Vendors please visit: HotelProjectLeads.com and subscribe today.


We at PiD are different to a standard Procurement Agent. This is why: We take advice from the relevant leading party i.e. Owning Company, Project Manager, Design Team and/or Operator on quantities and specifications of the FF&E / OS&E. We then source alternative suppliers on an ‘equal or approved’ basis. The vast majority of our supply network is based in Asia, predominantly China, where we have our regional office based in Guangzhou. Quality levels are monitored by the PID team– we also oversee the management of logistics to fall in line with the Master Program and scheduling. Procure It Direct also take full Contractual Responsibility on Delivery, Time and Quality. International Warranties are offered as a minimum.

We usually generate savings of between 30 – 40% and in some cases, more.

In addition to the Hotel sector, we operate in the following arenas:

– Commercial Office properties
– Schools and Education
– Student Accommodation
– Military supplies (non-defence)
– Staff Housing
– Pre-Fabricated Housing
– Retail
– Restaurants (in particular high street ‘chains’
– Aviation & Airports

www.procureitdirect.com


It’s been a very busy couple months for BCI Worldwide in Macau with three major projects all happening at the same time. The ongoing projects include: the renovation and conversion of the Four Seasons, renovation of the Encore Tower Suites, and renovation & re-branding of the Londoner at Sands Cotai Central. BCI Worldwide is managing the Furniture, Fixtures, and Equipment (FF&E) Logistics for each of these projects.

The Londoner is a major project by the Sands organization, with 1,700 guestrooms at Sands Cotai Central being renovated and re-branded to a London-themed integrated resort. BCI Worldwide is handling the de-installation and removal of all the old FF&E and the warehousing and installation of all the new FF&E. Over $2 billion USD has been invested by Sands China on this project alone.

Right across the street, similar work is being done on the Four Seasons Hotel Macau. Another Sands China owned property, this project will see the renovation and conversion of the property into a 289 room, all-suites hotel. Warehousing and installation of all the new FF&E going into the suites and public areas is being managed by BCI Worldwide.

And finally, the renovation of the 410 room Encore Tower Suites at Wynn Macau is aiming to finish up by the end of 2019. BCI Worldwide has been managing the on-site logistics since the beginning of the summer, having been working on the removal and de-installation of all the old FF&E and the installation of all the new FF&E.

“The amount of work BCI Worldwide has been selected to handle is a testament to the reputation and experience our team has within Macau and the Integrated Resort industry,” said Lino Airosa, Executive Managing Director for BCI Worldwide, “Some see it as a challenge, but we see it as an opportunity.”

About BCI Worldwide

BCI Worldwide specializes in Hospitality Logistics with a focus on hotel & commercial pre-openings and renovations. BCI Worldwide has operated for over 30 years and has handled and installed over 10,000,000 pieces of furniture across 500,000+ rooms with current operations in North America and Asia. Services include: FF&E and OS&E freight forwarding, warehousing, installation, project management, de-installation, and liquidation. Contact BCI Worldwide today to let us assist in your upcoming project.

www.bciworldwide.com


Hampshire, IL – BLUE RIDGE FIBERBOARD, a leader in the construction industry with roofing, sheathing and soundproofing products, offers SOUNDSTOP, a high-quality fiberboard that deadens sound transfer from room to room.

An eco-friendly and cost-effective option, SOUNDSTOP fiberboard suits soundproofing and sound insulation needs and can be used for effective application on walls, ceilings, and floors. SOUNDSTOP meets national codes and building standards and is ideal for homes and commercial buildings where noise transmission from room to room needs to be eliminated.

SOUNDSTOP allows for a continuous sound barrier across the entire wall blocking sound transfer though studs and the wall cavity. This provides superior performance to intermittent acoustical batt insulation design. The continuous barrier is the same concept utilized in laminated gypsum products; however, a system utilizing SOUNDSTOP instead can deliver great STC results at a fraction of the cost. Stopping the movement of the sound or shock vibrations to the other side, SOUNDSTOP can block out heavy traffic, blaring horns, airports, and other exterior noises.

“Not only is SoundStop easy to afford, but it offers great value and resale value for single and multi-family homeowners as well as commercial property owners,” said Mike Taylor, director of sales and marketing at BLUE RIDGE FIBERBOARD.

SOUNDSTOP is made from organic materials including hardwood fibers and can be installed on both existing and new surfaces by placing the fiberboard on both sides of standard wall partition.

In addition, SOUNDSTOP is now UL certified for the 1-hour fire rating in a load bearing wall system when installed behind drywall.

www.blueridgefiberboard.com


A mixed-use development underway in Clark County Ohio will also include new hotel that will be constructed on the property. The Champions Park project, a development of 14 acres of land near the entrance of the Clark County Fairgrounds in Springfield, Ohio will now include a 114-key SpringHill Suites hotel. The SpringHill Suites will be operated by Champions Innkeepers LLC — a joint venture between Har Bhatnagar and Dillin LLC. The joint venture will develop both the hotel and broader project, which will also include a retail and restaurant component. Plans also call for a new entrance and landscaping to the fairgrounds, a new fair office and retention pond in the area near Interstate 70 and Ohio 41. The hotel will begin construction later this year.  
 
For more information on this and upcoming hotel construction and renovation projects in the planning, design, pre-construction and construction phase including who is involved with their contact information, Project & Supply Pricing QuotesPreferred Vendor DirectoryCareers & Featured Vendors please visit: HotelProjectLeads.com and subscribe today.


Demolition of an old First National Bank building in downtown Gainesville Florida has begun in preparation of the new construction of a Courtyard by Marriott Hotel & Conference Center. Capstone Property Group led by president Jonathan Collins is developing the project which is located at 111 Green Street. The $50 million, 130 guestroom hotel will include, convention space, apartments, outdoor plaza and dining areas. Construction of the development could start this summer and be finished in late 2022 or early 2023.
 
For more information on this and upcoming hotel construction and renovation projects in the planning, design, pre-construction and construction phase including who is involved with their contact information, Project & Supply Pricing QuotesPreferred Vendor DirectoryCareers & Featured Vendors please visit: HotelProjectLeads.com and subscribe today.


HotelProjectLeads.com has launched preferred vendor directory videos which allows members to add a company video to their Preferred Vendor Directory listing.  “We are pleased to announce the launch of preferred vendor directory videos,” said Adam Smith, Manager of Operations.  “Videos provides our members an important tool to showcase their companies and get their company’s noticed online.  We look forward to adding even more tools and features in the coming months that will help our clients increase their sales.”  For more information on this and upcoming hotel construction and renovation projects in the planning, design, pre-construction and construction phase including who is involved with their contact information, Project & Supply Pricing QuotesPreferred Vendor DirectoryCareers & Featured Vendors please visit: HotelProjectLeads.com and subscribe today.


Demolition of an old First National Bank building in downtown Gainesville Florida has begun in preparation of the new construction of a Courtyard by Marriott Hotel & Conference Center. Capstone Property Group led by president Jonathan Collins is developing the project which is located at 111 Green Street. The $50 million, 130 guestroom hotel will include, convention space, apartments, outdoor plaza and dining areas. Construction of the development could start this summer and be finished in late 2022 or early 2023.
 
For more information on this and upcoming hotel construction and renovation projects in the planning, design, pre-construction and construction phase including who is involved with their contact information, Project & Supply Pricing QuotesPreferred Vendor DirectoryCareers & Featured Vendors please visit: HotelProjectLeads.com and subscribe today.


Gun Lake Casino in Wayland Michigan plans a $300 million expansion project of its property near Wayland into a hotel resort. The expansion is expected to include a 250-key, four-diamond hotel with suites, rooms, a restaurant and a full-service spa. The casino also plans to create its own version of a year-round island oasis with a pool enclosed in a glass dome, hot tub, private cabanas and a nightlife entertainment space with live music, DJs and dancing. Gun Lake Casino President and Chief Operating Officer is Sal Semola. Gun Lake Casino is in the midst of a $100 million expansion, which will add two restaurants and space for an additional 450 slot machines, 12 new table games and a larger nonsmoking area. The Gun Lake Tribe expects to begin the expansion as soon as its current construction project wraps up, which is expected late this summer. JCJ Architecture is designing the project.
 
For more information on this and upcoming hotel construction and renovation projects in the planning, design, pre-construction and construction phase including who is involved with their contact information, Project & Supply Pricing QuotesPreferred Vendor DirectoryCareers & Featured Vendors please visit: HotelProjectLeads.com and subscribe today.


Hotel developer Midas Hospitality plans to begin construction of a 170 room Residence Inn in Clayton Missouri business district. The hotel designed by Base 4 Architects & Engineers is located at 8125 Forsyth Blvd at a cost of $47 million. The extended stay hotel will be complete with fully equipped kitchens, with fitness center and 3,300 square foot meeting space with outdoor terrace and bar and laundry facilities. Guestrooms will receive a complimentary breakfast, as well as access to evening social events. The property will be managed by Midas Hospitality and built by Midas Construction.  
 
For more information on this and upcoming hotel construction and renovation projects in the planning, design, pre-construction and construction phase including who is involved with their contact information, Project & Supply Pricing QuotesPreferred Vendor DirectoryCareers & Featured Vendors please visit: HotelProjectLeads.com and subscribe today.

1 65 66 67 68 69 108