Plans are underway to build a new hotel, office space and residential development to Ontario Ohio’s shopping district off U.S. 30. Real Estate Company Moment Development, presented its preliminary plans for a four-story hotel and other projects to the Ontario Planning Commission. Moment Development recently bought six parcels of land off Walker Lake Road. The City of Ontario and Moment Development have a Planned Unit Development agreement in which both parties determine the standards of the development project before assigning a specific zoning code. Chris Knapton, director of development administration for Moment Development, plans to build the hotel first and later add restaurants, office space and residential townhomes or apartments. Moment Development is planning a summer 2023 groundbreaking for the hotel, with most of the project’s construction planned for fall and winter 2023. The hotel will be a 120-unit Home2 Suites by Hilton Hotel located at 2577 Walker Lake Rd. It will include 154 parking spaces shared between the hotel and restaurant space. Moment Development will present edited plans to the Ontario Planning Commission Nov. 9. After the planning commission approves the development, it will go to Ontario City Council for final approval before construction may start.
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


Electronic Do-Not-Disturb (or Electronic DND) is a simple way for guests to communicate their wish for Privacy from the comfort of their room. From a touch keypad installed by the door or by the bed, a guest can request Privacy or Make-Up my Room. This simple luxury will get great reviews.  The guest selection is communicated to all comers by an LED indication in a stylish custom room number sign or doorbell. Typically, the LEDs light up a lit ring around the doorbell button.  This sleek, effective solutions can be customized to your design criteria.  Integration with smart control solutions...


The developers of a mixed use project on Congress Street in Portland Maine presented their plans to replace a run-down building with a 12-story luxury hotel. The proposal includes the site of the former Portland Press Herald printing plant to be called Herald Square which comprises three attached buildings, including a 156 guest room hotel, 297 condominiums, seven retail units totaling about 11,500 square feet, a 5,100-square-foot restaurant, recreation space and more than 330 parking spaces. Fathom Companies, is the hotel developer and is expected to present its initial site plan proposal to the planning board at a workshop on Oct. 25. Marieke Thormann is the vice president of development for Fathom. Daniel Riley, vice president of design & engineering company, Sebago Technics, is managing the hotel project through the city review process. The 135-foot tall hotel will provide 70 below-ground valet parking spaces for guests. A small public space will be created in front of the hotel’s entrance near Congress and Myrtle streets and the hotel could feature a coffee shop and restaurant. A landscaped amenity deck, including a public promenade and green space bisecting condo units and fitness and meeting areas, is part of the project. No hotel brand has been selected.
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


The owners of the Downtown Sheraton Hotel Memphis Tennessee are planning a $226 million renovation and expansion of the hotel across from the Renasant Convention Center. Owner Starwood Capital Group was granted a 30-year payment in lieu of tax incentive and a 5% tourism development zone surcharge by a Downtown Memphis Commission board. Starwood Capital plans to renovate the entire hotel and construct a new tower to add 300 rooms to the 600-room hotel.   Currently, renovations are expected to start in late 2023 and will be phased to allow the hotel to continue to operate. The work is projected to take 18 months. Construction of the new tower is expected to begin in 2024 and take 20 to 22 months. Rob Tanenbaum is managing director of asset management for Starwood.
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


The Easton, Pennsylvania Planning Commission granted a conditional land development approval for the proposed Grand Riverview Hotel on South Delaware Drive. The proposal is for an eight-story, 108-room hotel by developer Terry Briggs of Chester Franklin Group LLC. The facility is to be located on the river corridor at 289-303 S. Delaware Drive, also known as Route 611. In addition to the guest rooms, meeting and event spaces, a restaurant and bar, rooftop venue, terrace and gazebo are planned. The developer’s plan is to reactivate the cave left on the property by Kuebler Brewing Company by using it in a food and beverage concept. In addition, the proposal calls to preserve any existing foundation walls left behind by the previous building. The brewing company opened in 1850 and closed just over 100 years later in 1952. The proposed 160,296-square-foot hotel will rise 98 feet above the ground and will include 3.5 parking floors. The first floor parking deck will include 49 parking spaces, with 47 combined on the second and third floors, and 21 on the fourth for a total of 215 spaces. In addition, the developer indicated an exclusive elevator is proposed for the fourth floor, which visitors can take down to what will be called Kuebler’s Cave. The fifth, sixth and seventh floors are scheduled to consist of a mix of king- and queen-sized rooms and various amenities. A penthouse is proposed for the eighth floor, which will include kitchen and banquet facilities, meeting spaces and a restaurant.
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


A hotel is ready to begin construction as a piece of a downtown Raleigh North Carolina project. Plans have been filed with the City of Raleigh for the construction of a 138-room hotel at 415 S. Blount St. The hotel developer, Summit Hospitality, is working with Williams Realty & Building Company to bring a hotel and apartment project to the site. The hotel will be a Marriott-branded TownePlace Suites. Plans show one 7-story building totaling 85,000 square feet and featuring 138 guest rooms. The hotel site is currently used as a parking lot. The hotel would include a lobby bar, expanded fitness facilities and integrated outdoor terraces. The apartment portion of the development, situated at 414 S. Person St., is already under construction and is being marketed as The Acorn on Person Street. The building will also rise 7 stories and total 92,000 square feet. Approved plans show 4 stories of residential units 107 in total above 3 stories of shared structured parking. Cline Design Associates is the project Architect.  
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


A developer is planning to build a 81 guestroom Home2 Suites by Hilton off Armory Road in Waterville Maine, close to Interstate 95 and two existing hotels. Hill Hospitality is proposing the hotel, which would be built on 2 acres to be split off from 75 Armory Road and 21 Industrial Park Road. Retlew Investment LLC, which owns 21 Industrial Park Road, is scheduled to ask the planning board for an informal preapplication review for the hotel. Retlew and Caprilite LLC, which owns 75 Armory Road, will also request revisions to a previously approved subdivision to create the 2-acre site for the hotel. Retlew and Caprilite want to sell the property to the developer, but the property must be subdivided before the sale to allow for hotel construction. The hotel is scheduled to break ground in 2024 and will have an indoor pool and fitness center.
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


The former Red Lion hotel at 102 S Third St in downtown St Joseph Missouri will be redeveloped into a 150 guestroom Courtyard by Marriott hotel. Construction of the new hotel is planned to begin May 31st 2023 pending approval from the St Joseph City Council. The anticipated opening of the hotel is Dec. 31, 2024. The property’s owner, and new hotel developer is HDDA. The new hotel will include a bistro, fitness room, and business center and conference space. Rod Rothschild is the president of HDDA.
  
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


After opening a boutique hotel in Las Vegas Nevada’s Arts District this year, the same real estate company is looking to build another project nearby. Z Life Co., developer of the English Hotel, filed plans with the city to build another hotel and residential building. The project is being designed by Ed Vance & Associates Architects and will be located at: 900 S Main Street, Las Vegas Nevada.  
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.


As part of a continuing development in the downtown corridor, Skokie Illinois trustees approved a $50 million hotel and conference center to be begin construction this spring. E&M Strategic Developments is the group that plans to build a 141-room Homewood Suites by Hilton Hotel and Conference Center on the former Sanford Brown College site at 4930 Oakton St. The hotel is just one component of a $400 million downtown redevelopment plan. The Hilton hotel will replace the Sanford Brown College office building, which has been vacant since 2014. The hotel and conference center meets the Illinois energy conversation code and will have the latest construction energy efficient systems throughout. Mark Meyer, is E&M Strategic Developments’ founder and CEO.
 
For detailed information on upcoming hotel developments, construction & renovation projects in the planning, design, pre-construction and construction phases including who is involved plus their contact information and our Preferred Vendor Directory & featured vendors please visit: HotelProjectLeads.com and subscribe today.

1 44 45 46 47 48 120